How I Built Audio-Reactive Visuals for "Piano Phase" | TouchDesigner Network Breakdown

📝 Summary:
In this tutorial, I’ll break down the visuals I created for “Piano Phase” by Steve Reich using TouchDesigner.

⚪ Key OPs used:
Table DAT, Transform TOP, Audio Analysis COMP, Blur TOP, LFO CHOP, Feedback TOP

⏱️ Timestamps:
0:00 Introduction
0:23 Final Effect Preview
0:44 Design process
1:58 Network Overview
3:05 Building from scratch

🎧 Song used:
Piano Phase – Steve Reich

📁 Project file:
Follow along to create similar effects, or download the ready-to-use project file here: https://instantinfinitework.gumroad.com/l/vhmfn

#touchdesigner #audioreactive #vj #visuals #pianophase #stevereich

About The Author

You might be interested in